Al-Qalaa Central Water Well Construction Project in Central Khan Younis

CMWU has completed the drilling and construction of the Al-Qalaa Central Water Well in the center of Khan Younis, southern Gaza Strip, funded by UNICEF and implemented in cooperation with Khan Younis Municipality. This intervention is part of CMWU’s efforts to strengthen water resources and improve the capacity of the water supply system to meet the growing needs of the population.

UNICEF
Completed
Water

Rehabilitation of Al-Matāhin Al-Jadeed and Abu Mariziq Water Wells to Enhance Water Supply in Al-Qarara

CMWU, in cooperation with EcoPeace Middle East and Al-Qarara Municipality, completed the rehabilitation of Al-Matāhin Al-Jadeed Water Well in Al-Qarara, which had been completely destroyed. The intervention aims to strengthen water sources and improve access to water for residents and displaced people.

محافظة خان يونس0$
EcoPeace Middle East
Progress100%
Completed
Wastewater

Rehabilitation and Maintenance Project for Three Wastewater Networks in Various Areas of Khan Younis City

The project included the rehabilitation and maintenance of three wastewater networks in Al-Manshiya, Al-Kusaikha, and Abu Shamlah areas of Khan Younis Governorate. The works aim to enhance the networks’ capacity to collect and convey wastewater from the served residential areas, to the maximum extent possible under the current conditions, while reducing wastewater overflows and associated public health hazards.

Norwegian Refugee Council (NRC)
Completed
Wastewater

Cleaning and Rehabilitation Project for the Sheikh Ajleen Wastewater Treatment Plant in Gaza City

The works were carried out as a preliminary step toward restoring the plant’s operation. They included removing accumulated sediment, sludge, and sand from treatment ponds and channels, pumping stagnant water, clearing vegetation and debris, and transporting waste to environmentally approved disposal sites. The works also included repairing concrete ponds, addressing cracks and damage, and servicing and lubricating control gates to ensure their readiness for operation.

UNICEF
Completed
Water

Rehabilitation Project for the “Northern UNRWA” Water Well in Khan Younis City

The well serves the western neighborhoods of Khan Younis City, supplying the Al-Buraq Reservoir operated by Khan Younis Municipality. The reservoir, in turn, distributes water to several areas, including the Japanese Neighborhood, Emirati Neighborhood, Dutch Neighborhood, Western Camp, and Al-Amal Neighborhood.

Palestinian Environmental Friends - PEF
Completed
Desalination

Al-Manshiya Desalination Plant Construction Project in Gaza City

CMWU implemented the construction works for the Al-Manshiya Desalination Plant in Gaza City as part of its ongoing efforts to increase the availability of safe drinking water and improve the level of services provided to residents, amid the ongoing challenges in the Gaza Strip, particularly following the extensive damage to water facilities in the city.

ICRC
Completed
Water

Rehabilitation Project for Shalāq Well in Al-Zahra City and Well (F203) in Al-Mughraqa Area

The project included the rehabilitation and electromechanical maintenance of Shalāq Well, debris removal, and technical assessment of damaged wells. Al-Mughraqa Well was prepared and test pumping conducted, while rehabilitation of the remaining wells is ongoing. The intervention aims to restore damaged water sources and improve water supply to shelters in Al-Mughraqa and Al-Zahra.

ICRC
Completed
Desalination

Project for the Maintenance and Rehabilitation of Al-Aqsa Tank Desalination Plant in Deir Al-Balah

The works included comprehensive maintenance of the desalination plant’s components, rehabilitation of its units, and improvements to its operational efficiency, enabling the plant to operate at a production capacity of approximately 30 cubic meters of desalinated water per day. This contributes to increasing the availability of safe drinking water and improving the level of service provided.

Solidarités International
Completed
Water

Supply and Installation Project of 20-Cubic-Meter Galvanized Steel Water Tanks

This intervention is part of CMWU’s ongoing efforts to strengthen water resources and improve the continuity of water supply to shelters and residential communities in southern Gaza Strip. The project aims to increase water storage capacity at several vital locations experiencing high population density due to displacement, helping ensure regular water services and meet the daily needs of residents and service institutions.