Cleaning and Rehabilitation Project for the Sheikh Ajleen Wastewater Treatment Plant in Gaza City

The works were carried out as a preliminary step toward restoring the plant’s operation. They included removing accumulated sediment, sludge, and sand from treatment ponds and channels, pumping stagnant water, clearing vegetation and debris, and transporting waste to environmentally approved disposal sites. The works also included repairing concrete ponds, addressing cracks and damage, and servicing and lubricating control gates to ensure their readiness for operation.

WastewaterCompleted

Project gallery