Supply and Installation Project of 20-Cubic-Meter Galvanized Steel Water Tanks
This intervention is part of CMWU’s ongoing efforts to strengthen water resources and improve the continuity of water supply to shelters and residential communities in southern Gaza Strip. The project aims to increase water storage capacity at several vital locations experiencing high population density due to displacement, helping ensure regular water services and meet the daily needs of residents and service institutions.

Project gallery



Related projects
CompletedInstallation and maintenance of chlorination equipment and pumps at water facilities.
CMWU teams install and maintain chlorination equipment and pumps at water wells and water stations to ensure proper water disinfection and protect public health.
CompletedInstallation of 5-Cubic-Meter Flexible Water Tanks in Shelters and Underserved Communities Across the Gaza Strip
The installation covered shelters and residential areas across Deir Al-Balah, Nuseirat, Al-Zawaida, Khan Younis, Gaza City, and northern Gaza. The project aims to improve access to safe drinking water for displaced people and residents through regular refilling of the tanks by CMWU desalinated water tankers.
CompletedDevelopment Project for Ibn Taimiya Desalination Plant in Al-Brazil Neighborhood, Rafah, Southern Gaza Strip
The project consists of two phases. The first phase includes drilling a water well with a capacity of 80 cubic meters per hour to supply the plant with water, along with all necessary electromechanical works. The second phase involves upgrading and expanding the plant’s production capacity to serve approximately 60,000 residents and meet their needs for desalinated water, particularly in light of the difficult conditions faced by people in the Gaza Strip.
