Published on

Maintenance of S65A water well in Al-Maghazi camp by supplying a new pump, supported by CMWU, to serve about 10,000 people.
In cooperation with and supported by CMWU, Al-Maghazi Municipality carried out the maintenance works needed for water well S65A, located in the center of Al-Maghazi camp, central Gaza Strip, with this well serving about 10,000 people.
CMWU provided a new pump for the well, in addition to the parts and connections needed for connecting it, aiming to operate it at full capacity and connect it to the network.



