CMWU Begins Constructing a Line to Drain Excess Rainwater from a Collection Basin North of the Strip

Published on

CMWU begins constructing a line to drain excess rainwater from a collection basin near Umm Al-Nasr village, funded by the Red Cross.

CMWU Begins Constructing a Line to Drain Excess Rainwater from a Rainwater Collection Basin North of the Strip

Gaza / CMWU

CMWU, funded by the International Committee of the Red Cross, began constructing a line to drain excess rainwater from a rainwater collection basin near Umm Al-Nasr village, north of the Gaza Strip, which poses a danger to the residents of neighboring areas, as this line works to drain that water into another basin at the same location with a larger capacity, with this project aiming to protect residents and their property from the risks of rainwater flooding, in addition to strengthening the rainwater drainage system in that area.

Share this story

Photos from this story