Addressing Sewage Overflow in Jabalia City in Cooperation with the Municipality

Published on

CMWU, in cooperation with Jabalia Municipality, addressed sewage overflow in several areas of the city using a vacuum truck.

A CMWU crew carried out an emergency intervention in Jabalia city, north of the Gaza Strip, in cooperation with a Jabalia Municipality crew, to address the effects of sewage overflow problems that appeared at intersections and roads in several scattered areas of the city.

The intervention included using CMWU's vacuum truck, based in Rafah, along with specialized technical teams, where work was carried out to pump out water and clean the damaged sanitation networks, aiming to protect residents and displaced persons from the risks of sewage flooding, particularly given the current conditions facing the Gaza Strip in general and North Governorate in particular.

Share this story

Photos from this story