Published on

Operating the border rainwater collection basin in Rafah on an area of 20 dunums, which received 140,000 m3 of rainwater.
Photos|| Operating the border rainwater collection basin project in Rafah, with this basin, constructed on an area of 20 dunums, receiving rainwater from 30% of Rafah city, particularly Ubaida and Al-Nujaili areas, through a concrete culvert with dimensions of 2.2x3 meters, with the basin having received 140,000 cubic meters of rainwater, with the rainfall level during the past two days reaching 75 mm.
#CMWU_is_Life



