Construction of a New Water Line in the Abu Ghalyeh Area of Al-Bureij Camp

Published on

CMWU, with support from UNICEF, constructed a new 200-meter water line in the Abu Ghalyeh area of Al-Bureij camp to connect it to the Sinjab well.

CMWU, in cooperation with Al-Bureij Municipality and with support from UNICEF, constructed a new 50mm-diameter, 200-meter water line in the Abu Ghalyeh area of Al-Bureij camp, central Gaza Strip, connecting the area to the Sinjab water well.

This line is part of ongoing efforts to improve water services and address the problem of recurrent supply interruptions suffered by residents in the area, particularly given current conditions and increased water needs.

The new line is expected to contribute to strengthening water pumping quantities and improving its reach to citizens, serving about 1,000 people, easing residents' suffering and ensuring the continuity of service at the minimum possible level.

Share this story

Photos from this story