CompletedWater Network Rehabilitation and Repair Project in Al-Amal Neighborhood and UNRWA Housing Areas in Khan Younis, Southern Gaza Strip
The works include the supply and installation of water pipelines with diameters of 4, 6, and 8 inches, as well as 50 mm, along with the necessary fittings and connections and the connection of households to the network, contributing to improved efficiency and sustainability of water services.
CompletedInstallation of 5-Cubic-Meter Flexible Water Tanks in Shelters and Underserved Communities Across the Gaza Strip
The installation covered shelters and residential areas across Deir Al-Balah, Nuseirat, Al-Zawaida, Khan Younis, Gaza City, and northern Gaza. The project aims to improve access to safe drinking water for displaced people and residents through regular refilling of the tanks by CMWU desalinated water tankers.
CompletedExpansion of the Southern Gaza Seawater Desalination Plant
Expansion and Development Project of the Southern Gaza Seawater Desalination Plant, increasing its production capacity to 20,000 cubic meters per day, enabling it to serve approximately 250,000 residents across large areas of Khan Younis and Rafah. The project is funded by the European Union through UNICEF, in cooperation with CMWU and the Palestinian Water Authority (PWA).
CompletedInauguration and Operation of the Central Treatment Plant in the Eastern Central Gaza Strip
Completed**Construction of a Wastewater Network in the European Neighborhood, Al-Fukhari, East of Khan Younis**
Construction of a Wastewater Network in the European Neighborhood, Al-Fukhari The project includes the installation of 3.5 km of wastewater networks and 300 household connections in the European Neighborhood, Al-Fukhari, east of Khan Younis, southern Gaza Strip. It is implemented in cooperation with PWA and Al-Fukhari Municipality, and funded by KFAED through the Islamic Development Bank (IsDB).
CompletedDevelopment Project for Ibn Taimiya Desalination Plant in Al-Brazil Neighborhood, Rafah, Southern Gaza Strip
The project consists of two phases. The first phase includes drilling a water well with a capacity of 80 cubic meters per hour to supply the plant with water, along with all necessary electromechanical works. The second phase involves upgrading and expanding the plant’s production capacity to serve approximately 60,000 residents and meet their needs for desalinated water, particularly in light of the difficult conditions faced by people in the Gaza Strip.
CompletedInstallation and maintenance of chlorination equipment and pumps at water facilities.
CMWU teams install and maintain chlorination equipment and pumps at water wells and water stations to ensure proper water disinfection and protect public health.