Development Project for Ibn Taimiya Desalination Plant in Al-Brazil Neighborhood, Rafah, Southern Gaza Strip

The project consists of two phases. The first phase includes drilling a water well with a capacity of 80 cubic meters per hour to supply the plant with water, along with all necessary electromechanical works. The second phase involves upgrading and expanding the plant’s production capacity to serve approximately 60,000 residents and meet their needs for desalinated water, particularly in light of the difficult conditions faced by people in the Gaza Strip.

WaterCompleted

Project gallery